maandag 27 juni 2016

working on floor of vinly house

fixed the concrete blocks and then poor the floor

fixed the blocks

Gepost door SuPoORaIN op 17:45
Dit e-mailen Dit bloggen!Delen via XDelen op FacebookDelen op Pinterest

Geen opmerkingen:

Een reactie posten

Nieuwere post Oudere post Homepage
Abonneren op: Reacties posten (Atom)

Over mij

SuPoORaIN
Mijn volledige profiel tonen
Thema Vensterfoto. Mogelijk gemaakt door Blogger.

Blogarchief

  • ▼  2016 (14)
    • ►  december (1)
    • ►  november (1)
    • ►  augustus (1)
    • ►  juli (1)
    • ▼  juni (10)
      • working on floor of vinly house fixed the concret...
      • issues with 12v to 100v comverter I switched my s...
      • strawberry holder and small deep water boxes for...
      • I bougth a Concrete mill because of all the concre...
      • getting the rest of the patato's.. after getting 3...
      • Start
      • Pulled out 40% of my patatos I got 12.5 kilos medi...
      • Main problems vinly house aquaponic system I buil...
      • Now the photos 3 years later 2016 june inside the ...
      • After building my green house with 450 watt solar...